1 July 2024
The coalescer is in full swing
The 18.5 meter long coalescer being built in the workshop is taking shape.
Video not specified. Please select one to display.
New welding robot in place in the workshop
After several months of installation and testing, the robotic welding station is ready for use.
Full pipe production in the workshop
Tratec Halvorsen now produces frame structures, pipes and tanks for two large development projects on the Norwegian continental shelf.