On an overtaking job in the North Sea

Three employees from Halvorsen are ensuring the offshore life of a 1989 hot water boiler is extended.

– We now have three men offshore. They will be replacing the exhaust pipes and carrying out general maintenance, so that the boiler can be recertified, says Narve Tunheim, head of temperature-exposed equipment at Halvorsen.

The 1.5 megawatt boiler is used for heating a module on an oil platform in the North Sea.

The job is estimated to take 14 days. We do a number of such jobs throughout the year. In addition to extending the lifespan of boilers, we also produce new ones, of course, says Tunheim.

Collaborate with us?

We are happy to help you with your project.

Contact us

More projects

Screenshot-2024-12-18-at-15.54.19
New welding robot in place in the workshop
After several months of installation and testing, the robotic welding station is ready for use.
Screenshot-2024-12-03-at-20.11.53-1941x1275-1
Full pipe production in the workshop
Halvorsen is now producing frame structures, pipes and tanks for two major development projects on the Norwegian continental shelf.
AQ9I5024-2268x1275-1
Record-breaking tank produced in the workshop
Never before has a larger tank been produced in Halvorsen's workshop. The 6Mo tank measures almost 20 metres.
Screenshot 2024-09-16 at 16.03.21
The coalescer is leaving the workshop
After several hundred hours of welding and other mechanical work, the coalescer could be transported out of the workshop.
Screenshot-2024-07-01-at-15.08.38-1929x1275-1
Work is in full swing on the coalescer
The 18.5-metre-long coalescer being built in the workshop is taking shape.
AQ9I0822-1913x1275-1
The square tank ready for testing
The first of the six tanks for the new Hugin A platform is nearing completion in the workshop.
20220127_074948-1913x1275-1
Exhaust ducts replaced and pressure tanks refurbished on Jotun FPSO
For two years, Halvorsen has been installing new exhaust ducts and upgrading pressure vessels on the Jotun FPSO production ship.
AQ9I7561-2048x1365-1
Building large freshwater tank
The first of a total of six topsides for Aker BP's new Hugin A platform in the Yggdrasil area is under construction at the workshop in Øyesletta.